EMPLOYER | MAKYOL – EZE ORTAKLIĞI |
PROJECT | E-5 HIGHWAY BUYUKCEKMECE BRIDGE
The cutting of approximately 3000m3 reinforced concrete structure of the existing 5 piers without dropping into the sea by using wire cutting method, and the loading and transportation of the resulting excavation works, as part of the Kabataş Transfer Center (Martı) project. |
STARTING DATE | 18.07.2016 |
FINISH DATE | 10.03.2017 |