E-5 Highway Buyukcekmece Bridge

EMPLOYER MAKYOL – EZE ORTAKLIĞI
PROJECT E-5 HIGHWAY BUYUKCEKMECE BRIDGE

The cutting of approximately 3000m3 reinforced concrete structure of the existing 5 piers without dropping into the sea by using wire cutting method, and the loading and transportation of the resulting excavation works, as part of the Kabataş Transfer Center (Martı) project.

STARTING DATE 18.07.2016
FINISH DATE 10.03.2017